Bechtel Marine Propulsion Corporation (BMPC) is testing a supercritical carbon dioxide (S-CO2) Brayton system at the Bettis Atomic Power Laboratory. The 100 kWe integrated system test (IST) is a two shaft recuperated closed Brayton cycle with a variable speed turbine driven compressor and a constant speed turbine driven generator using S-CO2 as the working fluid. The IST was designed to demonstrate operational, control, and performance characteristics of an S-CO2 Brayton power cycle over a wide range of conditions. Initial operation of the IST has proven a reliable method for startup of the Brayton loop and heatup to normal operating temperature (570 °F). An overview of the startup process, including initial loop fill and charging, and heatup to normal operating temperature is presented. Additionally, aspects of the IST startup process which are related to the loop size and component design which may be different for larger systems are discussed.
Skip Nav Destination
e-mail: Eric.Clementoni.contractor@unnpp.gov
e-mail: Timothy.Cox.contractor@unnpp.gov
e-mail: Christopher.Sprague.contractor@unnpp.gov
Article navigation
July 2014
Research-Article
Startup and Operation of a Supercritical Carbon Dioxide Brayton Cycle
Eric M. Clementoni,
e-mail: Eric.Clementoni.contractor@unnpp.gov
Eric M. Clementoni
1
Bechtel Marine Propulsion Corporation
,West Mifflin, PA 15122
e-mail: Eric.Clementoni.contractor@unnpp.gov
1Corresponding author.
Search for other works by this author on:
Timothy L. Cox,
e-mail: Timothy.Cox.contractor@unnpp.gov
Timothy L. Cox
Bechtel Marine Propulsion Corporation
,West Mifflin, PA 15122
e-mail: Timothy.Cox.contractor@unnpp.gov
Search for other works by this author on:
Christopher P. Sprague
e-mail: Christopher.Sprague.contractor@unnpp.gov
Christopher P. Sprague
Bechtel Marine Propulsion Corporation
,West Mifflin, PA 15122
e-mail: Christopher.Sprague.contractor@unnpp.gov
Search for other works by this author on:
Eric M. Clementoni
Bechtel Marine Propulsion Corporation
,West Mifflin, PA 15122
e-mail: Eric.Clementoni.contractor@unnpp.gov
Timothy L. Cox
Bechtel Marine Propulsion Corporation
,West Mifflin, PA 15122
e-mail: Timothy.Cox.contractor@unnpp.gov
Christopher P. Sprague
Bechtel Marine Propulsion Corporation
,West Mifflin, PA 15122
e-mail: Christopher.Sprague.contractor@unnpp.gov
1Corresponding author.
Contributed by the Cycle Innovations Committee of ASME for publication in the JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER. Manuscript received January 9, 2014; final manuscript received January 14, 2014; published online February 18, 2014. Editor: David Wisler.
J. Eng. Gas Turbines Power. Jul 2014, 136(7): 071701 (6 pages)
Published Online: February 18, 2014
Article history
Received:
January 9, 2014
Revision Received:
January 14, 2014
Citation
Clementoni, E. M., Cox, T. L., and Sprague, C. P. (February 18, 2014). "Startup and Operation of a Supercritical Carbon Dioxide Brayton Cycle." ASME. J. Eng. Gas Turbines Power. July 2014; 136(7): 071701. https://doi.org/10.1115/1.4026539
Download citation file:
Get Email Alerts
Heat Release Characteristics of a Volatile, Oxygenated, and Reactive Fuel in a Direct Injection Engine
J. Eng. Gas Turbines Power
Comprehensive Life Cycle Analysis of Diverse Hydrogen Production Routes and Application on a Hydrogen Engine
J. Eng. Gas Turbines Power
Related Articles
Off-Nominal Component Performance in a Supercritical Carbon Dioxide Brayton Cycle
J. Eng. Gas Turbines Power (January,2016)
Design of a 1 MWth Supercritical Carbon Dioxide Primary Heat Exchanger Test System
J. Energy Resour. Technol (September,2021)
Performance Characteristics of an Operating Supercritical CO 2 Brayton Cycle
J. Eng. Gas Turbines Power (November,2012)
Sliding Pressure Inventory Control of a Supercritical CO 2 Cycle for Concentrated Solar Power—Analysis and Implications
J. Sol. Energy Eng (February,2024)
Related Proceedings Papers
Related Chapters
Outlook
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Thermodynamic Performance
Closed-Cycle Gas Turbines: Operating Experience and Future Potential