Geothermal energy has been used for power generation, space and process heating, and to a lesser extent, space cooling. However, it is rarely used for cogeneration. This paper shows how a district heating/cooling system can be incorporated into an existing geothermal power plant to make the best use of extracted hot brine. In the power plant analysis, exergy destruction throughout the plant is quantified and illustrated using an exergy cascade. The primary source of exergy destruction in the plant is determined to be the reinjection of used brine into the ground, which accounts for 48.1 percent of the total exergy destruction. The overall first and the second law efficiencies of the plant are calculated to be 5.6 and 28.3 percent, respectively, based on the exergy of the geothermal fluid at downwell, and 5.7 and 28.6 percent, respectively, based on the exergy of the geothermal fluid at wellhead. A binary system is considered for the heating/cooling district to avoid corrosion and scaling problems. The heating system, as designed, has the capability to meet the entire needs of the Reno Industrial Park under peak load conditions, and has 30 percent reserve for future expansion. An absorption system will be used for the cooling of the intended 40 percent floor space of the industrial park. An economic analysis shows that the incorporation of the district heating/cooling system with 2,785,000 m2 of floor space connected to the geothermal grid appears to be feasible, and financially very attractive. Further, using the returning freshwater from the district heating/cooling system for partial cooling of the binary fluid of the power plant can save up to 15 percent of the fan work.
Skip Nav Destination
Article navigation
June 1998
Technical Papers
Incorporating a District Heating/Cooling System Into an Existing Geothermal Power Plant
M. Kanog˘lu,
M. Kanog˘lu
Department of Mechanical Engineering/312, University of Nevada, Reno, Reno, NV 89557
Search for other works by this author on:
Y. A. C¸engel,
Y. A. C¸engel
Department of Mechanical Engineering/312, University of Nevada, Reno, Reno, NV 89557
Search for other works by this author on:
R. H. Turner
R. H. Turner
Department of Mechanical Engineering/312, University of Nevada, Reno, Reno, NV 89557
Search for other works by this author on:
M. Kanog˘lu
Department of Mechanical Engineering/312, University of Nevada, Reno, Reno, NV 89557
Y. A. C¸engel
Department of Mechanical Engineering/312, University of Nevada, Reno, Reno, NV 89557
R. H. Turner
Department of Mechanical Engineering/312, University of Nevada, Reno, Reno, NV 89557
J. Energy Resour. Technol. Jun 1998, 120(2): 179-184 (6 pages)
Published Online: June 1, 1998
Article history
Received:
July 16, 1997
Revised:
October 27, 1997
Online:
November 6, 2007
Citation
Kanog˘lu, M., C¸engel, Y. A., and Turner, R. H. (June 1, 1998). "Incorporating a District Heating/Cooling System Into an Existing Geothermal Power Plant." ASME. J. Energy Resour. Technol. June 1998; 120(2): 179–184. https://doi.org/10.1115/1.2795031
Download citation file:
Get Email Alerts
Fuel Consumption Prediction in Dual-Fuel Low-Speed Marine Engines With Low-Pressure Gas Injection
J. Energy Resour. Technol (December 2024)
A Semi-Analytical Rate-Transient Analysis Model for Fractured Horizontal Well in Tight Reservoirs Under Multiphase Flow Conditions
J. Energy Resour. Technol (November 2024)
Experimental Investigation of New Combustion Chamber Geometry Modification on Engine Performance, Emission, and Cylinder Liner Microstructure for a Diesel Engine
J. Energy Resour. Technol (December 2024)
Downdraft Gasification for Biogas Production: The Role of Artificial Intelligence
J. Energy Resour. Technol (December 2024)
Related Articles
Design of a Multigenerational System With Absorption Cooling for a Residential Community: A Case Study
J. Energy Resour. Technol (June,2021)
Exergetic Performance Investigation of Varying Flashing From Single to Quadruple for Geothermal Power Plants
J. Energy Resour. Technol (December,2019)
Thermo-Mechanical Exergy Analysis of Balcova Geothermal District Heating System in Izmir, Turkey
J. Energy Resour. Technol (December,2004)
Performance Analysis and Optimization of Double-Flash Geothermal Power Plants
J. Energy Resour. Technol (June,2007)
Related Proceedings Papers
Related Chapters
Threshold Functions
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Introduction
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration
Piping and Pumping Systems
Geothermal Heat Pump and Heat Engine Systems: Theory and Practice